Freiburg Unterlinden district
Freiburg, 2011
Freiburg's largest construction site becomes Freiburg's newest city centre district. The 9-storey, solitary office tower in the Unterlinden district was opened in April 2011. The 65-million euro project has therefore been completed after a construction period of several years.
Multi-part acoustic floating ceilings with Rd 1,8 - 21 % perforation equipped with cooling elements ensure a high-quality room atmosphere. Long-span lights are suspended between the frequently sectionalised floating ceilings to create an optimum working environment. Pillar incisions with shadow joints and large-format angled elements made high demands on technique and production, which in some cases were solved using the in-house laser welding unit.
| Project data | |
| Perforation: | Rd 1,8 - 21 % |
| Colour: | RAL 9010 |
| Metal ceiling area: | 2,200 m² |
| System: | Floating ceiling |
| Function: | Acoustics, cooling and heating |