Shopping centre Herti and offices, Zug
Albi Nussbaumer Architekten ETH SIA BSA / Zug, 2020
Shopping Herti was opened in 1983 and rebuilt/ renovated in 2020. PLAFONDNOVA AG acted as engineering and installation company for this project. There are currently 17 stores on the 4,300 m² of the sales floor. Metal ceilings from Fural and Metalit were used in the shopping center and offices: EI 60 fire protection ceiling, floating ceilings, clip-in system and hang-in system. All types of ceilings provide perfect room acoustics and, in addition, they are a visual eye-catcher.
Project data | |
Perforation/Mesh: | Rv 25-46,3% | glatt | 16x8x2x1 mm | Rg 4,0-48% |
Colour: | RAL 9016 matt | RAL 9010 | RAL 7022 | RAL 9016 matt |
Surface metal ceiling: | 900 m² | 45 m² | 110 m² | 600 m² |
System: | floating ceilings | fire protection EI 60 | clip-in system | hang-in system |
Function: |
acoustics, fire protection, design |
Photos: PLAFONDNOVA AG