Sisi Museum – Wiener Hofburg, Vienna

WEHDORN ARCHITEKTEN Ziviltechniker GmbH

With approximately one million visitors annually, the Sisi Museum, the Imperial Apartments, and the Silver Collection are among the most significant cultural attractions of the Vienna Hofburg. As part of the extensive redesign and reopening, a cohesive museum experience was created, connecting the historic areas both spatially and functionally. A central element of this redevelopment is the new staircase in the Marschallhof courtyard, which significantly improves barrier-free access to the exhibition areas.

For the architectural design of the four-storey staircase, the FURAL expanded metal ceiling system with KLG hang-in system – Type B, as well as the expanded metal hang-in wall cladding – Type B, were installed. The systems define the space through their precise detailing and high-quality materials, creating a unified architectural appearance across ceilings and walls. At the same time, they meet demanding functional requirements in terms of accessibility and maintenance, as all elements were designed to be individually removable for inspection and servicing.

The technical implementation was particularly challenging due to the complex geometry of the staircase. The intricate floor plan required an exceptionally high number of individually customised infill panels and made-to-measure cassettes. Of the 65 ceiling cassettes, 48 different sizes and shapes were manufactured, while the 82 wall cassettes comprised 28 different formats. Despite this high degree of variation, precise planning, manufacturing, and installation of the hang-in elements ensured a uniform appearance with continuous lines and accurately aligned joints.

The expanded metal system combines architectural quality with functional performance. In addition to its sophisticated appearance, the open mesh structure supports the acoustic requirements of the space while providing easy access to the technical installations behind the panels. The result is an architecturally sophisticated solution that respects the historical context of the Hofburg while meeting contemporary requirements for design, functionality, and building operation.

Participants

Internal: Maximilian Huemer (Technical Department), Philipp Wiplinger (Project Manager)

Architect: WEHDORN ARCHITEKTEN Ziviltechniker GmbH

Client: Schönbrunn Group

Project Period: June 2025 – December 2025

 

 

Project data

 
Mesh: 16 x 6 x 2 x 1,5 mm
Colour:

Parzifal RAL 7013 lacquered

System:

Expanded Metal Ceiling with KLG Hang-in System – Type B and Expanded Metal Hang-in Wall Cladding – Type B

Area : Ceiling: approx. 80 m²; Wall: approx. 50 m²
Function: Aesthetics, Acoustics, Inspectable

 

 

Fotos: ©stauss processform gmbh, münchen